Features/Construction Administration

Construction Administration

Who has it, and for how long.

CA is where projects drown: RFIs in one inbox, submittals in another, and a meeting to work out who is holding things up. In LODE an RFI names the sheet and revision it is asking about, the submittal log is built from your specs, and ball-in-court is always visible, with a clock on it.

Construction administration software for architects should keep the paper trail without making anyone keep it. LODE files every RFI, submittal, observation and revision in the project, against the sheets and spec sections they refer to.

Last updated

RFI Register14 to date · 2 open
RFI 014Guardrail height at north stair landingArchitect2d
RFI 013Roof assembly transition at A301Answered—
RFI 012Door hardware set at Stair 2Contractor5d
Ball-in-court tracked per hop — the clock shows who has it, and for how long
DashboardFilesPlanningBiddingCAFinancialsCloseout⛏LODE

Construction Administration is a tab on every LODE project, not a separate product. It works from the same drawing set, so nothing has to be exported to it.

How does LODE handle construction administration?

Every CA record lives in the project next to the drawings it is about. RFIs cite their sheets and track who holds them. The submittal log is built from your spec sections before the first submittal arrives. Observations file with their photos. ASIs and bulletins are revisions, so the drawing change and its paper trail are one record.

RFIs that cite their sheets

Your number and the contractor’s, a question type (clarification, a reference with the sheet attached, a sketch) and routing hop by hop. Reopening keeps the same RFI, adds the exchange and restarts the clock.

Ball-in-court, with a clock

Routing tracks who holds each item and for how long, per hop. The question that used to cost a meeting is a column.

Submittals from your specs

The log is built from your CSI spec sections, so there is nothing to type and nothing to forget. Each submittal is tracked from submission to approval, and the response package is filed with it. With Loupe on, Loupe Review takes the first pass.

Observations

Field observations with photos and files attached: what was seen, when, by whom, filed where the project can find it again.

Revisions as CA records

ASIs and bulletins are CA records and go through the same revision engine that compiles the set, so the drawing change and its paper trail are the same thing.

The contractor portal

Your GC works from a link, with no seat and no account. Responses and submittals land in the project. Notifications stay in the app; LODE does not fill inboxes.

The submittal log builds itself.

How is the submittal log built from the specs?

A submittal log is usually a spreadsheet somebody builds by reading the specs line by line, and it goes stale the day the first addendum lands. LODE builds it from the spec sections it already compiled, keeps it pointed at the current revision of every section, and tracks each submittal through to approval.

  • Built from the spec sections, so the log exists before the first submittal arrives
  • Every submittal knows its spec section, and every section knows its current revision
  • Response packages are filed with the submittal, not attached to an email
  • Approved submittals go onto the closeout deliverables list automatically
Submittal Registerseeded from spec sections
08 11 13Hollow Metal Doors and FramesSub 014Approved
08 71 00Door HardwareSub 019In review
05 52 13Pipe and Tube RailingsSub 021Revise & resubmit
The register writes itself from Division sections — nothing to type, nothing to forget

Who is LODE's CA for?

Architects and the consultants who answer RFIs with them. The contractor needs no seat: the portal is a link, responses and submittals land in the project, and the ball-in-court clock runs either way.

Frequently asked questions

Can contractors respond to RFIs and upload submittals without a paid seat?

Yes. The contractor works from the portal link, with no seat and no account. Their responses and submittals land in the project, and the ball-in-court clock records how long each hop took.

How is the submittal log built?

From the CSI spec sections LODE already compiled. The log exists before the first submittal arrives, each submittal knows its section, and each section knows its current revision.

What happens when an RFI is reopened?

The same RFI is kept. The new exchange is added to it and the clock restarts, so the history stays in one place.

Are ASIs and bulletins tracked as drawings or as CA records?

Both, because they are the same thing in LODE. An ASI or bulletin is a CA record that goes through the revision engine, so the superseded sheets are replaced in the current set and the paper trail stays with them.

Do contractor uploads count toward my storage?

Yes. Files uploaded through the portal are stored on your project and count toward your storage the same way your own files do. You can add capacity without changing plan.

Run CA in the same place as the drawings.

We'll be in touch when early access opens.