User guide/Construction Administration
Module 07
Construction Administration
RFIs, submittals, revisions, and observations — every exchange on the record, every court visible, and an optional portal for the contractor.
7.1 · Orientation
How CA is laid out
Six sub-tabs: Overview · RFIs · Submittals · Revisions · Observations · Settings. Two ideas run through all of them:
| Ball in court | Every record tracks who holds it — multiple parties at once, each on its own clock. Handoffs are logged, never edited. Every register has a court column, and the Overview lists “In court now” with review-window bars and overdue chips. |
| Notifications | A gold badge on the CA tab counts items waiting on you. LODE sends no CA email, ever — the record is in the product, not an inbox. |
CA Settings holds the submittal review window, the RFI response window, your firm’s review stamp (an uploaded image or your own action labels), and branding.
7.2 · RFIs
RFIs in four steps
A follow-up reopens the same number — the exchange appends and the clock restarts, so one question stays one thread. The register exports to a spreadsheet.
7.3 · Submittals
Submittals: the register and the record
The register is built straight from your compiled spec sections — the same specs always produce the same register, with no AI guesswork — so the log exists before the first submittal ever arrives. Re-reading the specs adds “Suggested” rows and flags “No longer in spec”; it never changes rows on its own. “Not required” stays visible with a reason; “Complete” marks a requirement satisfied outside LODE.
The record: one bundled submittal can satisfy many requirements, and bundles stay bundled. Revisions run R0 → R1 with a reason. Several reviewers can work at the same time — each with their own markup layer, own stamp, own court. An optional DOC first pass can flag issues early (never a gate). The return requires an outcome — approved, approved with conditions, rejected, or no review, stamped in your firm’s own words — and locks the document permanently. A changed decision is a new revision.
7.4 · Revisions
Revisions
A revision is an issuance — ASI, Bulletin, PR, or CCD. Two views:
Stage → LODE: at Set in Stone, every linkage stamps at once — answers RFI-x, closes OBS-y. The drawing change and its paper trail are one thing.
7.5 · Observations
Site observations
Items are the record; reports are how you read them. A visit header carries the date, the weather (filled in automatically), parties present, and work observed. Items carry a status, photos, a location, and an optional pin on a sheet.
Unresolved items carry forward — the next report arrives half-written. Distribute locks the draft, produces the branded PDF, and shares it frozen as-is. Reports made outside LODE upload into the same register.
7.6 · Contractor portal
The contractor portal
Optional, permanently. A secure link scoped to their company lets the GC upload against a requirement, submit an RFI under their own number, and see stamped returns — no seat, no account. Links are shown once, can be revoked, and expire.
Logging what arrives remains the primary path — an architect who never issues a link loses nothing.